Sunday, 1 February 2015

Millie's Quilt. Finished

Yes, you read that right - I actually finished something!!!

This quilt started life as a little pile of Wee Wander that I bought from Natalie and Tracey at Pin it and Stitch at Quilts UK in Malvern last May. Unfortunately the girls had sold out of some of the prints but they were kind enough to point me in the direction of Little Laura's Haberdashery who had a few of the larger prints.


When I bought them I didn't have anything specific in mind I just knew that I needed these fabrics in my stash!

In June one of my husband's co-workers had a baby girl and I knew that I had to make her a quilt but between the all day nausea, constant tiredness and already too long list of WIPs/UFOs I didn't manage to make a start until the beginning of August.

I'd previously fallen in love with Susan's HR Fanclub Quilt and started fussy cutting some of the prints. As soon as I'd done this I decided that I wanted to add a few different solids. I had a look on-line to see if I could find anywhere that gave suggested matching Konas but all I could find were a few websites that named coordinating Cotton Couture. I don't know of anywhere in the UK that supplies Cotton Couture so I decided to wait a week so that I could compare colours in person at the Festival of Quilts in Birmingham.


I took some scraps of the different prints with me and with the help of two lovely ladies picked out Carnation, Candy Green and Dusty Blue as the best matches.

Picture courtesy of Anwen, aged 6.

As soon as I had the solids it didn't take me very long to get going again. In fact, as the beady eyed Nicky pointed out on IG I still had the entry stamp from FoQ on my hand! I was quite determined to get this quilt done, even if it did mean sewing with a toddler on my lap, and managed to get the top finished within the first two days of getting home from Birmingham.


Not sure how to quilt it I hung it up on our bedroom wall with some Washi tape and hoped that inspiration would strike.

This is where baby brain kicks in. I didn't take any pictures whilst I was quilting it and without the aid of 'Date Picture Taken' I have absolutely no memory of when I actually quilted this quilt. All I know is that I posted this picture of me adding some hand quilting whilst watching the GBBO final on iPlayer on the 13th of October!


I had a bit of a nightmare quilting this on the frame. The frame is set up in the attic where I have just enough headroom between the eves to use it. Last winter it was far too cold up there to do anything other than quickly grab a bag of hand-me-downs for Marged so the frame got neglected. When the weather got a little more spring like I went up to quilt my Soy Amado quilt (still not blogged that one properly) and noticed that there was mildew on the leaders. Thankfully I quick wipe with a damp cloth removed this and the frame didn't seem any the worst for wear. However, when I went to quilt this at the end of summer it became apparent that the changes in temperature that the frame was going through up there had warped the wood a little. It meant that the wooden runners which the sewing machine runs along during quilting didn't give as smooth a ride as usual. I also noticed that the pole that holds the quilt top in place didn't stay 'straight' when I was winding the quilt on. This combined with the quilting pattern I'd settled on and the fact that I was only quilting the background left my blocks very 'baggy' and I had gathers in some places.


The picture above shows the block which was most affected by this.

Tempted as I was to follow Susan's lead and pebble the background I knew from experience that although it gives stunning results it takes a very long time. I wanted something that was relatively quick but wanted to venture from my usual stipple. In the end I decided to go for a variation of the stipple. I think that I've heard it called the 'Riverbed' in the past but I'm not sure.


But I couldn't leave the quilt without at least a little pebbling so I pebbled around Millie's name.


I'm really glad that I did this as I feel that it makes Millie's name 'pop'.

The main reason why I'd left the blocks unquilted was because I wanted to add some hand quilting.


I kept it quite simple with just two lines running through the solid sashing. I used a matching colour thread in half the blocks and a contrasting thread in the other half. (Perle no8). I love the look of this chunky quilting but I think I could do with making the stitches a little longer next time - it might look a little neater on the back! (A vintage sheet, as if you needed to ask)


As I said in my goal setting post for ALYoF I made and attached the binding on Benji's Due date and then neglected it until January.


I sewed the binding down in short sessions here and there. I posted a picture on instagram and asked if anyone else tacked their binding down first. It turns out that I'm alone in this - most people seem to either use Wonderclips or binding clips or just keep the binding in place with their thumb as they go.


I've tried both of these methods and they just don't work for me. I find that clips get in the way of my left hand and make sewing uncomfortable. I can do it by holding the binding in place with my thumb but find that I'm having to adjust it all the time and that's not enjoyable either. I do enjoy hand sewing so really don't mind tacking the binding down first and it makes actually sewing the binfing down properly a breeze and gives me a neater finish.


One thing that doesn't work for me though is trying to hand sew whilst nursing. Trying to take a picture of this was even more difficult!

Anyway, I was soon finished and and with my husbands help I got some photos outside on a dry day!






But it wasn't finished yet. I needed to add the crinkle factor so I popped it in the washing machine along with a colour catcher and crossed my fingers. By the time it was out of the tumble dryer it was dark outside again and we haven't had a dry day since so you'll have to make do with a picture taken on our living room floor.


And lastly one of my favourite pictures as you can really see the crinkle added by the wash on the back.


Linking up with A Lovely Year of Finishes as this was my goal for January.



And nearly forgot that this was on my FAL list and is therefore my first (and hopefully not last) finish of Q1. Linking up when the time comes with Adrianne over On the Windy Side.

Edited to add:

Turns out this was my last finish of Q1 :-( Adrianne you can find my goal setting post here and I hope that it's OK that I haven't written a recap/end of quarter post, I just haven't got the heart to do it with such a looserville number of finishes.


2015 Finish-Along

Saturday, 17 January 2015

Here we go again

As you may be able to guess by the lack of blog post I didn't manage a single finish in Q4. Nope, I didn't manage to sew the binding onto Millie's quilt. 

During the 2014 FAL I only managed to finish six items that I'd listed on my goal setting posts and only managed to link up four of those finishes! However 2014 was a year were although my mojo was well and truly intact the time and space to sew was very sparse so I'm counting the 2014 FAL a success.

This year I'm not planning on getting pregnant so nausea shouldn't be a barrier to my sewing. I'm also not returning to work as I now have two children under school age and wouldn't be able to afford the childcare. So in theory I should have a lot more sewing time.......but then I do have three young children and don't have a dedicated sewing space so I'm not expecting five finishes a week either!

Taking this into consideration I've taken some items off the FAL list for now as I'm sure you're bored with seeing the same old pictures (some of them have been on the list since Q3 of the 2013 FAL!) and kept the list to what I REALLY want to get finished during the next three months. There are however a few that I just hope to make some headway on and have added them to the list on the off chance that I get a finish.

So here goes....

1. Millie's Quilt


I managed to sew one side of the binding down on the day that I linked this one up to ALYoF before I fell asleep on the sofa! I've since managed another two sewing sessions during which I finished a side a time so I literally only have about forty inches to go. If I don't manage that in three months I need shooting.


2. Benji's Nursing Cushion.


How I acquired this fabric needs it's own blog post. I plan on turning it into a new cover for the 'V' cushion that I use whilst nursing Benji. I currently have the plain cream one that came with the cushion and a lilac butterfly cover which I made whilst nursing Marged.


3. UKminiswap Quilt


Despite being very late sending off my #igminiswap quilt (another unblogged finish) I signed up for another swap. I've decided on what I going to do and gave my partner a choice of vintage sheets or rainbow. I'm still going to make both versions and keep one for myself. hopefully this will keep my partner guessing as to who her partner is :0)

4. Liberty Pouch.


Either this gets done this quarter or I throw the fabric out.


5. Kaffe Snowball.


It's been loaded on the frame for four months now. What is wrong with me?

6. 150% 241 Tote


I use my first 241 tote everyday but find it a tad small. I cut this one out at 150% but think it might be a little big. I'm not sure if I'm going to sew it up like this or cut a smaller version out of. Time will tell.

7. Anwen's Quilt Side 1.


Ready to go on the frame. Snowballs are in the way ;0)

8. Heol Petal Quilt.


I really like how this one's looking but I very much doubt that I'll get it done by the end of the quarter.

Right, so that's it. Eight goals. Guaranteed one finish. The rest, I can but hope.

Linking up with Adrianne at On the Windy Side for the first (and hopefully not last time)


2015 FAL at On the Windy Side

Tuesday, 6 January 2015

Hoping for a finish

I started the year with a blog post, a short blog post, but a blog post none the less. I am hoping to write a little more often during 2015 but I'm making no promises.

In the hope that it will encourage me to write a little more often I'm going to try and link up with Shanna and Melissa for A Lovely Year of Finishes every month. A great by-product of this of course is that I should have a finish every month to show for it too!

Now you all know that I don't have much free time on my hands these days so I'm going to keep my goal realistic.

I spent my due date, all the way back on November the 3rd, making the binding for Millie's quilt. I then attached it to the front of the quilt, folded it neatly and placed it in my hospital bag.

I was fully expecting to be induced as Benji was showing no signs of moving and I'd been warned many a time that being induced can take a very long time and can be very boring. This in addition to the fact that Anwen took 37 hours to make an appearance made me think that I'd have some time on my hands and a quilt to bind would be a nice distraction. Anway, Benji was a good boy and arrived the day before I was due to be induced, also he didn't fancy dragging the process out - I was at my sewing machine less than twelve hours before I met him!

Needless to say, when I arrived home Millie's quilt was untouched and I put it to one side whilst I concentrated of finishing my #igminiswap quilt.

So that's my goal for January - sew the binding onto the back of Millie's quilt.


Shouldn't be too hard, after all I have a whole month to get it done.

Or maybe not.

Katy did such a great job of hosting the FAL last year that I really want to link up at least one project to her last finishes party. That gives me just over twenty hours during which I'll also have to make three school runs, take Anwen to gymnastics, prepare three meals, attend a swimming pool committee meeting and feed a small baby 5-6 times.

Oh, and sleep, I'd like at least two hours if possible please?

Like I said a realistic goal :-) I'd better get stitching!

Linking up to A Lovely Year of Finishes


Thursday, 1 January 2015

Hello Strangers!


Just popping in quickly to say 

Blwyddyn Newydd Dda!


Benji Dafydd Lewis
Born 2.12pm November 12th 2014
8lb13oz
Hopefully I'll pop in a little more often during 2015!

Tuesday, 14 October 2014

Q4 Goal Setting

Oppppps....it happened again. This poor blog is looking more and more neglected everyday! Thank goodness for Katy and the FAL or I wouldn't post at all.

You may have noticed that I haven't blogged my finishes for the third quarter yet and the linky has long closed. Unfortunately I only managed two finishes from my Q3 list but was planning to write a blog post last Monday - this has become a bit of a tradition for me, writing the post on the last day of the linky party and getting it in just under the wire......lesson leant.

Last Monday Marged, my youngest, was admitted to hospital with suspected pneumonia. Luckily it was decided pretty quickly that it wasn't pneumonia but a 'wheeze' (I suspect that the Bronchiolitis Marged had at four months has left her with Asthma but I understand that the medical profession are very weary of diagnosing this before a child reaches seven years old). She responded very quickly to the medication she was given but I still ended up spending the night on a pull out parent camp bed (oh soooo comfortable at eight months) instead of writing up my Q3 finishes!

Last Monday was also my first day of maternity leave so I do hope that I will have a little more time to blog before this baby arrives and still plan to share these finishes with you in the next few weeks.

ANYWAY........Q4

I've been a good girl and not started anything new during the last quarter which means this list is going to look a little familiar.

1. Millie's Quilt.



I've made some serious progress on this one and finished adding some hand quilting last night. I just need to choose a binding now and of course sew it on.

2. Liberty Pouch.



Those screwdrivers are still rolling around in a drawer with my bras.

3. Secret Quilt.



I haven't touched this one since my last blog post - it's still a pile of blocks waiting to be pressed.

4. Kaffe Snowball.



I loaded this one onto the frame over a month ago but haven't touched it since, really hope to get it quilted before the baby arrives.

5. Anwen's Quilt, Side 1.



As soon as snowball comes off the frame I'm loading this one.

6. Summer Solstice.



Realistically, this one will roll-over to next year, but I might as well add it to the list!

7. Oakshott Runner.



Really want to start on this one but want to clear the quilts above first.

8. Plus Quilt.



I can dream can't I?


So, were down to eight. I'm not going to hold my breath - I've signed up for the IGminiswap and joined the Siblings Together Bee 2. These have to take priority and I haven't even pulled my fabrics yet! Oh yes, and there's the small matter of the new addition - three weeks (I hope) to go!

Linking up as ever with the Littlest Thistle


Finish Along 2014

Monday, 14 July 2014

My Goals for Q3

Where did the first half of the year go? It seems to have disappeared along with my productivity! With a baby due in Q4 I really need to make progress on my WIP/UFO pile so here's hoping for a VERY productive Q3......

It's a long list so I'll try and keep my descriptions short ;0)

1. Caravan Curtain Bag.



I'd originally planned to just make a tote similar to my Echo Bag (self drafted pattern) but I've decided that I need to be a little more adventurous and purchased the pattern for Noodleheads 241 tote. I cut out all my pattern pieces and interfaced them on Monday night so I'm all set to go!


2. Liberty Pouch.



I need somewhere to store my new set of screwdrivers so I'd better get a move on!


3. HST Cushion.



A new addition to the list. Here we have 240 1.5" HST which I made from trimmings from a (sort of) secret project. I plan on turning them into a cushion for one of Anwen's friends, and if I have any left over maybe a little wide open pouch.


4. Secret Quilt.

Another new addition. I have a plan. But I'm scared that the plan won't work out so I don't want to reveal exactly what it is just yet. I'm hoping that Katy will take the picture of the HSTs above as proof that I have indeed started this quilt. I've sewn all the blocks and I just (ha) need to press them, sew them together and then quilt it.


5. Wee Wander for Millie.



And my last new addition. A friend of the family has just had a little girl and I hope to turn this bundle into a quilt loosely inspired by Susan's HR Fanclub Quilt by the time she turns three months (and not three years old).


6. Anwen's Quilt - Side 1.



I've added borders to bring it up to size. I've pieced a back. Must. Get. This. Quilted.


7. Kaffe Snowball.




Thanks to the peeps on Instagram I think I've decided on the borders. I just need to order the fabric (I only have fat quarters of these prints and I'm hoarding them for something, who knows what, in the future) and decide if I'm going to buy a backing or use a vintage sheet from my stash. Oh yes, then there's the small matter of adding the borders and quilting it!

8. Summer Solstice.



For some reason I've managed to piece a back for this quilt but still haven't started piecing the front! I doubt that I'll have it finished by the end of the quarter but I'm keeping it on the list in the hope that it encourages me to pick it up from time to time ;0)

9. Oakshott Quilt Bed Runner.



Marged's managed to doodle (with a permanent marker!!!) all over our current, shop bought, bed runner. So I've decided that instead of turning this into a full quilt I'll just make a little runner for our bed. That way, I'm hoping, making the bed in the morning might put a smile on my face.

10. Plus Quilt.



This is a very long shot - but you never know right?

So that's it. Ten hopeful finishes for Q3. Wait a minute. Didn't I have ten on my list at the start of Q2? I thought that the whole point of this FAL was to reduce my pile of UFOs/WIPs? Oh well, I suppose people will carry on having babies and these babies go on to have birthdays!

Linking up to our hostess with the mostess, Katy.

I'm pretty sure that without the Finish-A-Long this list would be twice as long as, although I don't seem to finish much, it does (sort of) keep me focused and stop me from starting too many projects!


Finish Along 2014

Sunday, 6 July 2014

Five mins to spare


And we have a finished quilt!

A wash, proper photos and blog post to come :0)

Linking my third finish up to Katy


Finish Along 2014

Goal setting post here